Project Supply

Interior Doors for Multifamily, Hotel, Commercial and Builder Projects

Bring the door schedule. Our U.S. team confirms the supply scope with you item by item and quotes doors made to your specification in our factory, from slabs to complete packages with frame, casing and hardware preparation. You buy from a U.S. company, and we can arrange production, ocean freight and import through to your site.

See what to send ↓

Made in
Our factory in China, in Dongguan and at our 100,000+ m² Guangxi base
Supply
Slabs, doors with frames, or the complete package with casing and hardware preparation; knockdown as standard
Lead time
Typically 12–14 weeks from the start of production to delivery at your site
Delivery
FOB China port, CIF U.S. port or delivered to your job site, phased if needed
Approval
Shop drawings for your approval before production

01 — Who we supply

Built for the Way Your Project Buys Doors

Developers, contractors and builders get doors made to their own specification, not chosen from a stock list. Pick the tab that matches your project.

One Approved Specification, Unit After Unit

For apartment, condo and hotel unit doors: approve each door type once, and we make it to that specification across units, floors and buildings. Later phases and repeat orders can reference the same approved specification.

  • One approved specification per door type, across the project
  • Any combination: natural wood veneer, laminate, paint or another finish, over a solid core (particleboard or solid wood) or a hollow core
Residential towers, a project our factory supplied
Typical buyers
Multifamily and hotel developers, general contractors and door subcontractors
Start a request →

Also from us: wall panels from our factory, and furniture for hotel and multifamily projects from our factory or partner factories, by project.
Wall Panels → Furniture →

02 — Why BARAVEN

Doors From Our Factory, a U.S. Company Behind the Order

Project buyers usually choose between a distributor’s stock list and importing from a factory themselves. We sit in between: doors made to your specification in our factory, with our U.S. team running the order from the first email to delivery.

  • Our factory, NOT a trading companyYour interior doors are made in our factory in China, in Dongguan since 2002 and at our Guangxi production base since 2018. For container-volume projects, we open our factory for visits and audits. If you ask, the U.S. team member responsible for your order arranges the visit, meets you there and walks you through.
  • A U.S. company on your orderYou buy from BARAVEN under our written Terms, and our U.S. team handles damage and warranty claims under them. Limited 2-year warranty: see our Terms.
  • Your confirmed price, honoredThe price in your confirmed order is the price we honor for that scope.
  • Updates by emailAn email update at each main stage of your order, from approved drawings to delivery, with your delivery window in writing once your order is in production. See what the updates cover →
  • Natural wood veneer, competitively pricedOur factory’s China-patented panel-bending technology helps keep natural wood veneer doors competitively priced.
Production floor at our factory
Production floor at our factory

Lead time

Custom Doors: 12–14 Weeks

Custom door orders typically take 12–14 weeks from the start of production to delivery at your site. Production starts once your final specification is signed and your 50% deposit has cleared. That time buys you doors made to your specification in our own factory with no middleman, and our U.S. team running the order for you.

Planning guide

Doors needed on site in aboutSign your final specification and pay the deposit within about
4 months2 weeks
6 months2½ months
9 months5½ months

A planning guide, not a promise. The estimator gives a planning date for your own needed-by date.

See a planning date for your project in the estimator →

In stock

Need Doors Sooner?

Our in-stock pre-hung door sets ship from California with no minimum order. Subject to stock confirmation, they typically arrive 3 to 10 business days after dispatch, depending on destination and carrier.

03 — What to send

Send What You Have

Check off what you can share today. Unknown items are fine: we list them as open items instead of guessing. Attach up to 5 files on the request form: PDF, photos, Excel or Word.

04 — Before production

What We Confirm Before Production

The details we confirm with you before production starts. Final sizes are yours to confirm, and your approved drawings define the order.

  • Each opening, finalSize, handing, swing and wall thickness for each opening. Production starts only once your final specification is signed and your deposit has cleared.
  • Special openings, spelled outPivot doors, laundry closets and tight openings get a note on who supplies the frame, casing and special hardware.
  • Finish and hardware color, seen firstConfirmed with you by photo or sample before production; natural wood veneer varies from door to door.
  • Shop drawings you approveShop drawings go to you for approval before production. Changes after approval need our written confirmation and may change the price and date. This is supply coordination, not architectural or engineering approval. Ask us for a sample shop drawing from a past project. Door subcontractors get shop drawings per door mark, with the hardware preparation for each opening, for their submittal.

Orders are checked at our factory before packing. See the photos from a recent order →

Veneer jamb and casing profile samples, the wood veneer wrapped around each plywood edge
Finish samples: veneer jamb and casing profiles

05 — Supply options

Choose How Much Arrives Done

Slab, door with frame, or the complete package with casing and hardware preparation. Knockdown is our standard. Pre-hung is an option at extra cost: the door hung in its frame at our factory, the full door in one box per opening. On knockdown orders, the complete package arrives flat-packed and pre-bored for your hardware, for assembly on site. On custom orders, hardware is your choice: the hinges, lock and handle you specify, or pre-boring for hardware you source yourself. Pre-boring is available on every scope.

Done at Our Factory With the Complete Package

  • Factory-machined (mortised and bored) for the hinges, lock and handle you specify, supplied by us or sourced by you
  • Pre-finished
  • Frame and casing parts pre-cut

Left for Your Installer

  • Knockdown: assemble the frame, set it in the opening, shim and fasten it, following your installer’s practice; fit the hinges and hang the door; fit the pre-cut casings; fit the lock and handle
  • Pre-hung option: attach the handle, set the unit in the opening and secure it, then fit the casings

With the complete package, hinge and lock preparation is done at our factory. We supply; your installer installs.

A pre-hung door, unboxed: the door hung in its frame, in one box.
Door frame parts wrapped in film with cardboard corner protectors, ready for shipping
Frame parts wrapped and protected for shipping

06 — Delivery

Delivered the Way Your Project Needs

Choose the delivery basis that fits your project. Your quote states the basis, what it includes, the shipping timing and where risk passes to you.

Option 1

FOB China Port

We deliver the order on board at the port in China named in your quote; you or your forwarder handle freight, insurance and import from there.

Option 2

CIF U.S. Port

We pay ocean freight and marine insurance to the U.S. port named in your quote; you handle import from there.

Option 3

Delivered to Your Job Site

We arrange ocean freight, import and trucking through to your site, across the continental U.S. Your quote states whether duties, tariffs and customs fees are included.

A door order crated in plywood and strapped on a pallet at our factory, ready for export
A door order crated for export at our factory

Phased Delivery

Large projects can be delivered in phases, by building or floor. The phases and their planned dates are set out in your quote.

Freight in the U.S.

Freight is quoted with each order. Orders ship with our partner trucking company or an LTL freight carrier, or you can arrange pickup in Southern California in advance. We don’t ship to Alaska, Hawaii, APO/FPO addresses or P.O. boxes.

When It Arrives

Note any visible damage on the delivery receipt before signing, and report all damage, shortages or wrong items, including damage found after unpacking, with photos within 48 hours of delivery.

07 — Projects

Projects Our Team Has Supplied

U.S. projects supplied in 2026 include Corona del Mar, Burlingame and Norwalk, California. Our family’s company began in South Korea in 1997, and our factory has supplied major residential developers in China since 2003. We exhibited at IBS 2026 in Orlando.

Residential projects our founding team supplied from start to finish in South Korea and China: interior doors, moldings and other interior building materials.

South Korea

Hyundai Construction, residential project in South Korea supplied by our founding team
Hyundai Construction
Samsung Construction, residential project in South Korea supplied by our founding team
Samsung Construction
POSCO Park, residential project in South Korea supplied by our founding team
POSCO Park
KOLON Construction, residential project in South Korea supplied by our founding team
KOLON Construction
Ssangyong Construction, ADENAREX, residential project in South Korea supplied by our founding team
Ssangyong Construction, ADENAREX
Toyo High-Speed Construction, Jung-ja Paragon, residential project in South Korea supplied by our founding team
Toyo High-Speed Construction, Jung-ja Paragon
Hyundai Construction Plaza, residential project in South Korea supplied by our founding team
Hyundai Construction Plaza
Samsung Construction, Tower Palace, residential project in South Korea supplied by our founding team
Samsung Construction, Tower Palace

China

China Overseas, Guangzhou Lanwan, residential project in China supplied by our founding team
China Overseas, Guangzhou Lanwan
Vanke, Guangzhou City Garden, residential project in China supplied by our founding team
Vanke, Guangzhou City Garden
Gemdale Mingjin, residential project in China supplied by our founding team
Gemdale Mingjin
Guangzhou Guangda Garden, residential project in China supplied by our founding team
Guangzhou Guangda Garden
FavorView Palace, residential project in China supplied by our founding team
FavorView Palace
China Overseas, Top View, residential project in China supplied by our founding team
China Overseas, Top View
Bojia Bandao, residential project in China supplied by our founding team
Bojia Bandao
Shangdong Hongyu, residential project in China supplied by our founding team
Shangdong Hongyu

08 — Questions

Questions Project Buyers Ask

Straight answers before you send a door schedule. More on door types and finishes: Custom Interior Doors · Exterior Doors. Reselling doors? Dealer & Distribution.

Is there a minimum order?

Minimums depend on the specification and are confirmed in your quote.

What are the payment terms?

For custom door orders, a 50% deposit starts production; the balance is due before release. In-stock sets are paid in full when the order is placed.

Can you supply fire-rated doors?

Yes, by project. For openings that need a rating, we source labeled doors from partner factories that already supply the U.S. market. Tell us which openings need a rating and what your project requires.

How do your doors handle sound between rooms?

Solid-core doors are available where sound between rooms matters. Tell us what your project requires, and we quote to it.

Can we use your doors on HUD-funded or public projects?

Our doors are made in China. If your project has federal or other public funding, tell us every funding source up front; your funding agency or counsel decides which domestic-content rules apply.

Can I see a sample before ordering?

Yes. Ask for a sample in your quote request; you cover the shipping. Our IBS 2026 display doors are at our warehouse in La Mirada, California: schedule a visit, or ask for a video call.

Start a project

Send Your Door Schedule

Drawings, a door schedule or even a list of openings is enough to start; attach up to 5 files. If your requirements are still developing, tell us what is known and what is open. We reply by email within 1–2 business days.

Don’t see what you need? Moldings, flooring or other building materials for your project: tell us what you’re looking for, and we’ll check whether we can make or source it for you.

Download our spec sheet (PDF, 1 page) ↓

Or email info@baraven.com · La Mirada, CA: visits by appointment